Mumbai Port Authority (MbPA) holds its first pre-bid meeting for a proposed Victoria Dock marina project, drawing more than 35 industry representatives. Participants join in person or virtually, representing sectors including marina and marine services, infrastructure development, shipping, logistics, hospitality, finance, and consultancy.
The marina is planned for a protected water area of about 37.3 hectares and is designed to accommodate 604 yachts. The project is structured under a Design, Build, Finance, Operate and Transfer (DBFOT) model with a 45-year concession period, with an estimated cost of Rs 922.67 crore. MbPA will carry out initial marine infrastructure for the first 424 berths, while the concessionaire will develop land-based facilities such as a five-star hotel, a tourism business centre, a sailing school, a yacht club, a yacht repair yard, a dry stack facility and a fuel station.
Clearances for the full project area, including environmental and Coastal Regulation Zone (CRZ) approvals, are reported as already secured. Outlets also note that bidding will be based on the percentage of gross revenue shared with MbPA, with a minimum revenue share set at 11.5%, and that user charges will follow market conditions. Times of India specifies bids are due on December 15, while the other coverage emphasizes risk-reduction measures and protections in the concession agreement.