Nepal’s electricity utility is approved to import up to 350 megawatts (MW) of power from India to help cover winter demand, amid constraints in domestic generation. Multiple outlets report the arrangement runs from November 17, 2026, to July 31, 2027, and allows purchases for up to 17 hours per day.

The Kathmandu Post adds that the country can continue exporting 56 MW alongside the imports, citing exports from hydropower projects. Business Line frames the approval as a way to manage the seasonal mismatch between electricity demand and local generation. Free Press Journal provides additional operational details, saying the Indian regulator authorises NEA purchases via the Indian Energy Exchange (IEX) at market rates, and breaks down the import capacity across specific cross-border transmission links.

Across coverage, outlets agree on the headline figures (350 MW import approval and the winter time window) and the purpose of easing the seasonal supply gap. Differences are mostly in added context, such as winter hydropower variability and the impact of flood-related disruptions, and in whether transmission routes and export details are included.