Augustus Minerals has completed a 1,650-metre reverse circulation (RC) drilling program at its Music Well gold project in Western Australia, according to multiple reports. The drilling is described as follow-up work at the project near Leonora. Results from the program are not yet available, with assays pending. Sources also note that near-term outcomes include sample re-split results from the company’s maiden drilling campaign, indicating that additional work is underway to confirm or refine prior sampling results. Overall, the reports present the same sequence of events: the RC drilling campaign has finished, and the next phase is awaiting laboratory assay results for the newly drilled samples, alongside re-split results related to the earlier program. No figures on grade, intercepts, or estimates of resources are provided in the articles, and there is no reported change to project size or development plans in the coverage. The company’s findings are expected once the assay and re-split results are received.