A design render of the Brisbane Olympics aquatic centre in Spring Hill is unveiled ahead of the handover of the existing Centenary Pool to the Brisbane Games Authority. Multiple outlets report the preview of the venue’s look comes in the lead-up to the transfer scheduled in just over a month. The reporting indicates the images provide an early view of how the aquatic centre will be shaped for the Games following the changeover from the current facility. The coverage is focused on the presentation of the render and the timing of the handover, rather than detailing additional technical specifications or construction progress. Across the outlets, the central points are that the Spring Hill venue’s design has been shown publicly through a visual render, and that the operational control of the pool is due to pass to the Games Authority as the Games approach. No differing claims are presented between the sources regarding the timing or purpose of the handover, with all accounts aligning on the same announced schedule window and venue location.