Aurum Resources says it has returned a high-grade gold intercept at its Boundiali project in Côte d’Ivoire, in West Africa. Multiple outlets report that the company hit a 0.72 metre section grading 367 grams per tonne (g/t) gold. The result comes from drilling associated with the company’s rapidly developing Boundiali project. The reporting is consistent across sources on the headline figures: a 0.72m intercept and a 367g/t gold grade. No additional conflicting details are provided in the supplied summaries regarding the drill location within the project, the broader mineral resource implications, the nature of the deposit, or next steps for further drilling. Overall, the coverage focuses on the reported “bonanza” grade and the length of the intercept, presenting it as a notable exploration update for Aurum’s operations in Côte d’Ivoire.