Chief Minister N. Chandrababu Naidu inaugurates the second phase of Amaravati’s Seed Access Road and two steel bridges, as reported by multiple outlets. The new stretch is aimed at improving connectivity in the capital region and making access to Amaravati faster and more convenient for motorists.

According to The Hindu, the ₹1,519-crore project includes a road corridor from Rayapudi through Venkatapalem, Penumaka, and Undavalli, with a further third phase planned to link the capital region to NH-16. The same report says one bridge is a 110-metre crossing over the Buckingham Canal, while the other is a 280-metre span over the Kondaveeti Vagu. Business Line focuses on the inauguration’s expected impact on travel conditions and direct connectivity to the capital.