Singapore’s MRT system runs for nine consecutive months without any delay exceeding 30 minutes, the longest such streak since 2011, according to reliability data reported by the Land Transport Authority (LTA). The figures track major delays of 30 minutes or more and indicate improved performance across the network.
Both outlets note that the reliability measurements do not include the Thomson–East Coast Line (TEL), which is still under construction, extension, and system integration. The Straits Times frames the report as reliability improving for all lines, while also highlighting the streak since November 2025. Channel NewsAsia similarly reports the nine-month uninterrupted period and the record compared with 2011, while reiterating the exclusion of the TEL during its ongoing works.