Mumbai’s Brihanmumbai Municipal Corporation (BMC) orders the immediate closure and eviction of occupants from Orchid City Centre Mall on Bellasis Road in Mumbai Central. The civic body prohibits anyone from entering, using, or occupying the premises until repairs and required safety clearances are completed, following a Supreme Court directive.
The BMC’s D Ward issues a notice on September 1 requiring shop owners, occupants, and visitors to vacate their units on the ground and first floors. The action is tied to an August 25 Supreme Court order in the case of Esa Usman Seliya and others versus the MCGM and others. Officials from the BMC’s Building Proposal department and Fire Brigade serve the eviction intimation to the developers, including M/s Neelkamal Realtors & Builders Pvt. Ltd., M/s DB Realty, and M/s Neelkamal City Shopping Mall India Ltd.
Sources describe the closure as linked to a major fire at the mall in October 2020, which caused extensive damage and required a prolonged firefighting operation. The Supreme Court’s directions require that the building remains non-functional until structural repairs and statutory fire-safety requirements are met and BMC permission for re-entry is granted. The BMC warns that failure to comply may lead to forcible eviction and could amount to contempt of court.