A 100-metre-long steel bridge is launched in Bhiwandi, Thane district, for the Mumbai–Ahmedabad bullet train corridor. The structure is placed over NH-3 (near Dive-Anjur village) and is described as the first steel bridge completed in Maharashtra for the project. The National High-Speed Rail Corporation (NHSRCL) reports the bridge is 14 metres high and 14 metres wide.
All outlets say the bridge weighs about 1,405 metric tonnes and was fabricated about 1,300 km away in Tamil Nadu, in facilities around Tiruchirappalli/Trichy. After fabrication, the components are transported to Maharashtra on heavy-duty trailers and assembled on temporary supports at the site before being launched into position. NDTV focuses on the transport and installation of the bridge over NH-3, while the Free Press Journal provides more details on fabrication, assembly and launching methods, including quality checks and the use of hydraulic jacks.
The bridge is part of a wider plan to use steel bridges along the corridor where long spans are needed to cross highways and other infrastructure. Reports state that 28 steel bridges are planned overall, with 16 completed so far.