State-owned ONGC has not yet taken operational control of the Cambay basin block CB-OS-02 (also referred to as CB-OS/2) in Gujarat after Vedanta challenged the government’s refusal to extend the block’s contract term. The Ministry of Petroleum and Natural Gas rejected an extension via a directive dated September 19, 2025. The block’s participating interests are 50% for ONGC, 40% for Vedanta (through its oil and gas unit), and 10% for Invenire Petrodyne Limited. After the rejection, ONGC said it received instructions to take over operations and deployed an operational team to Suvali from September 20, 2025. ONGC, however, says Vedanta has not handed over operations. Vedanta filed a writ petition before the Delhi High Court on September 22, 2025 challenging the rejection. The court asks parties to file responses and directed them to maintain status quo; hearings have been completed and the matter is reserved for an order. Pending the outcome, ONGC states that Vedanta continues to act as operator for the block, while ONGC remains prepared to assume control if directed. Vedanta says the matter is sub judice. The PSC for CB-OS/2 expired on June 30, 2023, and earlier extensions were granted for other Vedanta Cairn blocks.