Aureka Limited has started an infill diamond drilling program at its Comstock gold project in Victoria, aiming to improve and upgrade the existing resource ahead of future development studies. All reports describe the drilling as part of preparations for a potential fast-track restart at the historic gold pit associated with the project. The campaign focuses on collecting additional subsurface information to refine the resource estimate, which is intended to support decisions on the next development step. The outlets note that the drilling is conducted using diamond drilling methods and is positioned as an early technical activity in the lead-up to broader studies that would assess development options. While the articles reference the goal of restarting work at the site, they do not provide details in these summaries about timing, results, estimated outputs, or approvals. The emphasis across sources is on the initiation of the drilling program to upgrade the resource base as a prerequisite for subsequent development assessment.