Larsen & Toubro (L&T) secures an order from Noida Metro Rail Corporation for work on the Aqua Line extension. All outlets cited describe it as a “significant” contract with a value in the range of ₹1,000 crore to ₹2,500 crore, based on L&T’s regulatory classification.
The project scope reported across sources includes part design and construction of a 15.1 km elevated corridor and the building of 10 elevated metro stations. The corridor is described as having an elevated viaduct segment connecting Botanical Garden to Noida Sector-142 and another stretch between Depot Station and Boraki, with station work covering architectural finishes and related civil infrastructure.
Outlets also report a schedule for completion. Free Press Journal and Swarajya both mention a 36-month timeline, highlighting delivery timing. The coverage is largely aligned on these core project details, with differences mainly in how much background each outlet adds about connectivity goals or contract categorisation.