Sigenergy breaks ground on June 29, 2026, on Phase II of its Nantong Intelligent Energy Center in China, according to a company-announced update carried by multiple sources. The project follows the ramp-up of Phase I, which the company says has been operating at full-load production since earlier this year. Phase II focuses on expanding the Nantong site’s intelligent energy storage capabilities and adds a joint venture production facility for energy storage structural components. The announcement describes the Phase II work as part of the broader development of the Nantong Sutong Science and Technology industrial area (as referenced in the sources). While the sources do not provide detailed financial figures or specific capacity targets in the excerpt provided, they consistently frame the Phase II launch as a continuation of existing operations at the Nantong complex and as an effort to increase in-country manufacturing and production related to energy storage systems and components. The reporting presents the event as a construction start, with Phase I already in full-load operation.
Sigenergy breaks ground on Phase II energy storage facility in Nantong, China
Sigenergy breaks ground on June 29, 2026, on Phase II of its Nantong Intelligent Energy Center in China, according to a company-announced update carried by multiple sources. The project follows the ra...
- Sigenergy starts construction (breaks ground) on Phase II of its Nantong Intelligent Energy Center on June 29, 2026.
- Phase I at the Nantong site is already in full-load production earlier this year.
- Phase II includes expanded energy storage-related operations at the Nantong facility.
- The project also involves a joint venture production facility for energy storage structural components.
- The initiatives are located in Nantong, China, at or near the Nantong Sutong Science and Technology industrial area.
NANTONG, China, June 29, 2026 (GLOBE NEWSWIRE) — Since phase I was put into full -load production early this year, Sigenergy has officially broken ground on June 29th on Phase II of its Nantong Intelligent Energy Center and a new joint venture production facility for energy storage structural components. Located in the Nantong Sutong Science […]
3 hours ago
Astronaut reportedly makes two-word request before death after spacecraft depressurization
Two reports describe an astronaut’s reported final words before dying following a sudden depressurization during a retur...
AP EAMCET/EAPCET 2026 results expected on APSCHE portal; candidates can download rank cards
APSCHE is expected to release the AP EAMCET (also referred to as AP EAPCET) 2026 results on its official admissions port...
Albania protests over Kushner-Trump-linked luxury resort plans on sensitive coastal wetlands
Protests in Albania are intensifying over a planned luxury tourism resort backed by Jared Kushner and Ivanka Trump, with...